Skip to main content
Generator and battery storage
Energy Solutions · Orange County

Power when it matters most.

Professional generator and battery storage installation throughout Laguna Beach, Newport Beach, and all of Orange County.

13+

Years installing power systems

200+

Energy systems installed

100%

Code-compliant installs

4.9

Google Rating

Why it matters

Grid uncertainty is real. Your backup should not be.

Southern California's grid is under growing strain. Wildfires, heat events, and aging infrastructure mean outages are no longer rare. At Laguna Electric, we've installed resilient power systems for luxury homes, medical facilities, restaurants, and businesses across Orange County since 2013.

Whether you want a whole-home standby generator, a silent battery wall, or both — our certified technicians deliver code-compliant, performance-optimized installations with full permitting and testing.

Choose your solution

Generator vs. Battery Storage

  • Runtime during outage
  • Noise level
  • Requires fuel refill
  • Works with solar
  • Automatic activation
  • Maintenance frequency
  • Starting installed price

Option A

Standby Generator

From $6,500 installed

  • Days to weeks
  • Audible (70-75 dB)
  • Yes
  • Compatible
  • Yes, automatic
  • Annual servicing
  • From $6,500

Option B

Battery Storage

From $13,000 installed

  • 12-36 hrs (essentials)
  • Silent
  • No
  • Ideal pairing
  • Instant switchover
  • Minimal
  • From $13,000

Can't decide? Generator + Battery gives you the best of both worlds.

Investment Estimator

What will it cost?

Configure your system below and see a real-time estimate based on current Orange County install pricing.

What do you need?

Our process

From consultation to commissioning.

Six structured steps that ensure your system is installed correctly, permitted, and performing on day one.

01

Site Assessment

We evaluate your property, load requirements, equipment placement, and utility access.

02

Custom System Design

Engineers design a system matched to your critical circuits, budget, and available space.

03

Permit Filing

We handle all electrical and gas permits, utility notifications, and city approvals.

04

Professional Installation

Licensed electricians complete all wiring, gas connections, transfer switches, and mounting.

05

Inspection and Testing

We simulate outages and verify every circuit and failover operates correctly.

06

Owner Training

Full walkthrough of your system, maintenance schedule, and direct support contact.

Laguna Electric technician

"Professional installation that exceeded every expectation."

— Arno S., Laguna Beach
FAQ

Common questions.

Do you handle all permits?

Yes. We manage electrical permits, gas line authorizations, and city/HOA approvals throughout Newport Beach, Laguna Beach, Corona del Mar, Dana Point, and Irvine.

How long does installation take?

Standby generator installs take 1-3 days. Battery-only systems typically complete in one day. Complex dual-system installs may take 2-4 days.

Can you install in existing homes?

Absolutely. We specialize in retrofitting power solutions with minimal disruption and full integration with your existing electrical panel.

What brands do you install?

We work with Generac, Cummins, and Kohler for generators, and Enphase and Franklin Electric for battery systems.

Are there tax incentives for battery storage?

Battery storage systems paired with solar may qualify for the 30% federal Investment Tax Credit. We can walk you through what applies.

Licensed & Certified By

YelpTesla Powerwall Certified InstallerNextdoor
CSLB
CA Licensed #1103125
Service Area

Serving Orange County & Beyond

Licensed electrical contractor based in Laguna Beach — trusted by homeowners and businesses across the Orange County coast.

EV Trend

California leads the nation in EV adoption

Over 25% of new vehicles sold in CA in 2025 are electric — residential EV charger installs are surging across Orange County.

Utility Rates

OC electricity avg $0.29/kWh (SCE Tier 2)

Southern California Edison Tier 2 residential rates — smart panels and load management can significantly reduce your bill.

Building Code

Title 24 requires EV-ready panels on all new builds

California's 2022 energy code mandates EV-capable circuits in all new residential construction — panel upgrades essential for older homes.

Solar Incentives

NEM 3.0 + $3,000 avg federal tax credit available

California's net metering 3.0 program plus the federal ITC means solar + battery storage installs often pay back within 6–8 years.

PSPS Risk

OC wildfire shutoffs — backup power now essential

SCE Public Safety Power Shutoffs affect thousands of OC homes annually. Generators and battery storage keep you powered.

Cities We Serve

Laguna BeachNewport BeachCorona del MarIrvineDana PointSan ClementeSan Juan CapistranoLaguna NiguelLaguna HillsAliso ViejoMission ViejoLake ForestHuntington BeachCosta MesaTustinLaguna WoodsRancho Santa MargaritaFoothill RanchMonarch BeachCrystal Cove

Click to load map

Laguna Beach, CA

Start a Conversation

Ready to power your home?

Contact Laguna Electric for a free site assessment and custom energy solution proposal.

4.9

Google Rating

500+

Projects completed

13 yrs

Established 2013

CA & NV LicensedFree Estimates24/7 Emergency

We respond within 1 business day · No spam, ever.